Watch what they do on the visit. A firm worth using lifts a block or probes the surface to see what is underneath before it gives a price. One that quotes from the pavement for relaying the blocks is quoting for the symptom, not the cause. On a front laid over crazy paving, that kind of repair will be back where it started within a couple of winters, and you will have paid twice for the same dip.
Listen for whether they will turn work down. If the drive rocks from gate to door, a decent firm tells you a repair is the wrong spend and prices a rebuild instead, even though the repair is the easier sale. If everyone you ring wants to patch a front that is failing everywhere, be suspicious. The honest answer is sometimes the more expensive one, and a firm that says so is usually the one to trust with the smaller jobs too.
Ask about the kerb. In South Ockendon, Thurrock Council builds every vehicle crossing itself, charging £264 per square metre, which works out at around £1,900 for a standard one. Any firm offering to drop your kerb as part of the job either does not know the rules or is ignoring them. Our job is the drive; the council does the crossing. A firm that explains that split clearly, without being asked, has done its homework on Thurrock.